Rooftop Solar in Pakistan: Size, Savings and Setup
Quick answer: A rooftop solar system turns sunlight into electricity with PV panels; an inverter converts it to normal 220 V AC for your home. In Pakistan 1 kW of panels makes about 4 units a day, so a home using 300 units a month needs about 2.5 kW (5 panels of 585 W) and roughly 150–175 sq ft of shade-free roof. Batteries are optional (hybrid) for load shedding.
How a solar panel system works
- Panels (PV) make DC electricity in sunlight. PV means photovoltaic.
- Inverter turns DC into AC for your appliances and syncs with the grid.
- Grid / net meter (on-grid) takes extra units in the day and supplies you at night.
- Batteries (hybrid / off-grid) store energy for night or load shedding.
- Protection: DC and AC breakers, SPD (surge protection device) and proper earthing.
Note: if you are looking for the planets "solar system" school model, that is astronomy – this page is about solar power for homes.
Size from your bill
Look at the units on your last 12 bills and take the summer average.
| Monthly units | System size | Panels | Units made / month |
|---|---|---|---|
| 200 units | 2 kW | 4 | about 240 |
| 300 units | 2.5 kW | 5 | about 300 |
| 400 units | 3.5 kW | 6 | about 420 |
| 500 units | 4.5 kW | 8 | about 540 |
| 600 units | 5 kW | 9 | about 600 |
| 800 units | 7 kW | 12 | about 840 |
| 1000 units | 8.5 kW | 15 | about 1020 |
| 1500 units | 12.5 kW | 22 | about 1500 |
Same maths as the calculator: kW = units ÷ 30 ÷ 5 ÷ 0.8, rounded up to the next 0.5 kW. Real output is lower in winter and on hazy days.
On-grid, hybrid or off-grid?
- On-grid: lowest cost, no batteries, switches off during load shedding for safety.
- Hybrid: grid + batteries; runs your essential load during load shedding.
- Off-grid: no grid; needs large batteries, used in remote areas.
Details in on-grid vs off-grid vs hybrid. Most city homes with long outages choose hybrid with lithium battery solar systems, because lithium (LiFePO4) batteries last longer and can be used deeper than lead-acid.
Roof, angle and safety
- Face panels to the south with a tilt close to your latitude – see solar panel tilt angle.
- No shade from water tanks or walls between 9 am and 4 pm.
- Use a strong galvanised steel or aluminium structure, raised for cleaning and wind.
- Choose an SPD and DC breakers rated for the system voltage on the panel string (maximum system voltage is printed on each panel, often 1,000–1,500 V DC).
- Clean panels every 1–2 weeks in dusty months.
Net metering and savings
With net metering your distribution company counts units you export and import. Rules and buy-back rates are set by NEPRA and the government and have been changing – read our net metering guide before signing. Savings depend on your slab: removing the top slab units saves the most. Estimate your bill with the electricity bill calculator.
Common mistakes
- Buying panels by price only, without checking the inverter warranty.
- Under-sizing the cable and breakers.
- Fixing panels flat – dust and lower output.
- Expecting an on-grid system to work in load shedding.