Construction Labour Rates in Pakistan
Quick answer: for houses, labour is usually charged per sq ft of covered area. Our grey structure labour rate is shown in the table below. Finishing trades (tiles, plaster, paint, electric, plumbing) are paid separately per sq ft, per point or per job. Daily-wage mistris earn more than helpers (mazdoor); rates rise in big cities and during the building season.
| Item | Price | Unit |
|---|---|---|
| Labour (grey structure) | — | per sq ft |
| Grey structure cost (standard, Lahore) | Rs 3,092 | per sq ft covered |
| Complete construction cost (standard, Lahore) | Rs 4,652 | per sq ft covered |
Advertisement
Types of construction contracts
| Contract | What you pay for | Good for |
|---|---|---|
| Labour only (thekedari) | Labour per sq ft; you buy materials | Owners who can supervise and buy material |
| Material + labour (grey) | Contractor supplies grey materials and labour | Busy owners; check material specs |
| Turnkey (complete) | Full house to agreed finish | Fixed budget; needs a detailed contract |
| Daily wage | Mistri and mazdoor per day | Small repairs and additions |
How to calculate labour cost
- Work out covered area (all floors).
- Multiply by the agreed labour rate per sq ft.
- Add separate trades: plaster, tiles, electric, plumbing, paint, woodwork.
- Keep 5–10% extra for changes.
Example: a 5 marla house with 1,913 sq ft covered area × grey labour rate per sq ft = grey labour cost. Finishing labour is often similar or higher in total.
Advertisement
Finishing trades and how they charge
- Tile and marble fixing – per sq ft
- Plaster – per sq ft of wall
- Electrician – per point (light, fan, socket)
- Plumber – per point or per bathroom
- Painter – per sq ft or per room
- Carpenter – per door or per sq ft of woodwork
How to reduce labour cost (safely)
- Finalise the naqsha and drawings before starting – changes cost the most.
- Get three written quotes with the same scope.
- Pay in stages linked to work done, not in advance.
- Keep material at site ready so labour does not wait.
- Avoid winter fog and peak monsoon for concrete work.
Advertisement
Labour for each stage
| Stage | Main trades |
|---|---|
| Foundation & frame | Mistri (mason), helpers, steel fixer, shuttering |
| Walls & plaster | Mason, helpers |
| Services | Electrician, plumber |
| Finishing | Tile/marble mistri, painter, carpenter, aluminium fabricator |
Hire specialist trades separately or include them in a turnkey contract with clear rates.
Related costs
Grey structure cost, cost per sq ft, construction cost calculator.
Official sources
Questions people ask
How do I calculate labour cost in construction?
Multiply the covered area (all floors) by the agreed labour rate per sq ft, then add separate finishing trades and a margin for changes.
What is the labour rate per square foot in Pakistan?
Our grey structure labour rate is in the table, updated 20 Oct 2026. Rates differ by city and contractor.
What is labour-only contract (thekedari)?
The contractor supplies only workers; you buy all materials. It is cheaper but needs your supervision.
How much is a mason (mistri) paid per day?
Daily wages differ by city and skill; mistris earn noticeably more than helpers. Ask local contractors for current rates.
How do I calculate labour cost in construction in Lahore?
Get per sq ft quotes from three Lahore contractors for the same scope and multiply by your covered area. Lahore rates are usually on the higher side.
What is the cost of labour for finishing?
Finishing labour is charged trade by trade (tiles, paint, electric, plumbing) and in total often matches or exceeds grey labour.
Should I pay the contractor in advance?
Pay a small mobilisation amount and then in stages after each part of work is checked.
What is overhead cost in construction?
Overheads are costs not tied to one item, such as supervision, site office, water, electricity, transport and contractor profit.