MEPCO Load Shedding Schedule Today

Updated 27 Oct 2026 · By , HisaabHub · How we check

Quick answer: MEPCO sets load shedding feeder by feeder across Multan and south Punjab, mostly by line losses, and announces planned maintenance shutdowns separately. Read your feeder name on the MEPCO bill, then check the MEPCO website and official pages or call 118 for the current schedule.

Advertisement

How to find the MEPCO load shedding schedule for your area

  1. Find your feeder name and sub-division on your MEPCO bill.
  2. Open the official MEPCO website (www.mepco.com.pk/) and look for the load management or shutdown schedule section.
  3. Check MEPCO's official social media pages for planned maintenance shutdown notices for your feeder.
  4. Call 118 and ask for your feeder's current schedule, or report a cut that is longer than announced.

South Punjab heat means peak evening demand is very high in June and July, so forced cuts are more common then.

Multan region customers can open the MEPCO online bill.

How load shedding is decided

Why does your area get more cuts than the next one? Because load shedding is planned feeder by feeder. Companies look at each feeder's losses (theft, hooks, unpaid bills). The worse the losses, the longer the cuts. Planned maintenance ("shutdown") and sudden faults are separate from this.

Advertisement

Rural and agricultural feeders on MEPCO

MEPCO has many rural and agricultural feeders that supply tubewells. These often follow a different supply pattern from city feeders, with set hours for farm supply. If you live in a village on a mixed feeder, your home supply may follow the agricultural schedule.

For Multan city bills, see the MEPCO bill Multan page.

Scheduled cut or fault?

  • Scheduled load shedding: same hours each day for your feeder; power returns on time.
  • Planned shutdown: announced in advance for maintenance, often for several hours on one day.
  • Fault: sudden, often only your street or transformer; report it on 118 with your reference number.
  • Forced load shedding: extra cuts when the system is short of power, usually on hot evenings.
Advertisement

Does load shedding lower my bill?

Only a little. You pay for the units your meter records, so hours without power mean fewer units, but most heavy loads (AC, pump, fridge) catch up once power returns. The rate per unit is the same. Watch for UPS charging: an old lead-acid UPS can waste 15–25% of the power it stores, which adds units every month.

A lithium battery wastes far less. Paired with panels, a solar system with lithium battery charges from the sun instead of your meter.

Stay powered during cuts

A UPS with a lithium battery, or a solar system with lithium battery, keeps fans, lights and Wi-Fi running through cuts. Solar also cuts the bill itself, because the battery is charged by the sun, not the grid. For the hottest months a solar or inverter AC is worth a look.

Official sources

Questions people ask

What is a MEPCO shutdown?
A planned power cut for maintenance on a feeder or grid station, announced in advance with the date and time.
When will electricity come back in my MEPCO area?
At the end of the scheduled slot. If it is much later, it is probably a fault; report it on 118.
Can solar help during load shedding?
Yes. A solar system with a lithium battery runs fans, lights and other loads during cuts and lowers your bill too.
Do low-loss areas have load shedding?
Feeders with very low losses often have little or no scheduled load shedding, though faults and forced cuts can still happen.
What is the MEPCO load shedding schedule today?
It depends on your feeder. Check the MEPCO website and official pages, or call 118 with the feeder name from your bill.
How do I check MEPCO load shedding by reference number?
Your reference number tells the helpline which feeder you are on. Call 118 with it, or look up your feeder name on the bill.
Why is there so much load shedding in my MEPCO area?
Your feeder likely has high line losses or low bill recovery. Loss-based load shedding gives such feeders more hours.
How do I complain about load shedding to MEPCO?
Call 118 and register a complaint with your reference number. If cuts continue beyond the schedule, you can complain to NEPRA online.
Advertisement