IESCO Load Shedding Schedule Today

Updated 27 Oct 2026 · By , HisaabHub · How we check

Quick answer: IESCO sets load shedding by feeder. Many Islamabad sector feeders have few scheduled cuts because losses are low, while some Rawalpindi and rural feeders have more. Find your feeder on the IESCO bill, then check the IESCO website and official social pages for the load and shutdown schedule, or call 118.

Advertisement

How to find the IESCO load shedding schedule for your area

  1. Open the official IESCO website (www.iesco.com.pk/) and look for the load management or shutdown schedule section.
  2. Find your feeder name and sub-division on your IESCO bill.
  3. Call 118 and ask for your feeder's current schedule, or report a cut that is longer than announced.
  4. Check IESCO's official social media pages for planned maintenance shutdown notices for your feeder.

Feeders in Attock, Chakwal and Jhelum districts can have different hours from the twin cities.

Why load shedding happens

Load shedding in Pakistan today is mostly loss-based. Each feeder (the line from the grid station to your area) is put in a category by its line losses and bill recovery. Feeders with low theft and good payment get few or no scheduled cuts; high-loss feeders get many hours. Extra cuts also happen when demand is higher than supply in peak summer evenings, and during maintenance shutdowns.

Advertisement

IESCO grid station shutdowns

People often search by grid station (for example the G-10 grid). A planned shutdown at a grid station switches off all feeders fed from it, so a whole sector can lose power for a few hours on the announced day. IESCO posts these shutdowns in advance.

City guides: IESCO bill Islamabad and Rawalpindi load shedding.

Scheduled cut or fault?

  • Scheduled load shedding: same hours each day for your feeder; power returns on time.
  • Planned shutdown: announced in advance for maintenance, often for several hours on one day.
  • Fault: sudden, often only your street or transformer; report it on 118 with your reference number.
  • Forced load shedding: extra cuts when the system is short of power, usually on hot evenings.
Advertisement

Load shedding checklist for your home

  • Fill the overhead water tank before your usual cut time.
  • Charge phones, power banks and the UPS battery while power is on.
  • Keep the fridge door closed during cuts; a full fridge stays cold for hours.
  • Unplug sensitive electronics during storms and switch them on one by one after power returns.
  • Keep a torch and a rechargeable fan where you can find them in the dark.

Stay powered during cuts

A UPS with a lithium battery, or a solar system with lithium battery, keeps fans, lights and Wi-Fi running through cuts. Solar also cuts the bill itself, because the battery is charged by the sun, not the grid. For the hottest months a solar or inverter AC is worth a look.

Official sources

Questions people ask

What is the IESCO load shedding schedule today?
It depends on your feeder. Check the IESCO website and official pages, or call 118 with the feeder name from your bill.
How do I check IESCO load shedding by reference number?
Your reference number tells the helpline which feeder you are on. Call 118 with it, or look up your feeder name on the bill.
Why is there so much load shedding in my IESCO area?
Your feeder likely has high line losses or low bill recovery. Loss-based load shedding gives such feeders more hours.
How do I complain about load shedding to IESCO?
Call 118 and register a complaint with your reference number. If cuts continue beyond the schedule, you can complain to NEPRA online.
What is a IESCO shutdown?
A planned power cut for maintenance on a feeder or grid station, announced in advance with the date and time.
When will electricity come back in my IESCO area?
At the end of the scheduled slot. If it is much later, it is probably a fault; report it on 118.
Can solar help during load shedding?
Yes. A solar system with a lithium battery runs fans, lights and other loads during cuts and lowers your bill too.
Do low-loss areas have load shedding?
Feeders with very low losses often have little or no scheduled load shedding, though faults and forced cuts can still happen.
Advertisement