Quick answer: To get a FESCO new connection, apply online on the government ENC portal (enc.com.pk) or through the FESCO website, upload your CNIC, ownership proof and wiring test report, and save the tracking ID. After a site survey you get a demand notice; pay it at a bank and the meter is installed. Track every stage with your ID.

Advertisement

How to apply for a FESCO new connection

  1. Open the government's online new connection portal (ENC) at enc.com.pk, or the new connection link on the official FESCO website.
  2. Choose FESCO, your category (domestic, commercial, industrial, agricultural) and the load you need in kW.
  3. Fill in your details and upload the documents.
  4. Save the tracking ID. You will need it for every follow-up.
  5. Wait for the site survey. Staff check the wiring, the nearest pole or transformer and the load.
  6. Pay the demand notice at a bank when it is issued.
  7. The meter is installed and a reference number is created. Your first bill follows the next billing cycle.

Documents you usually need

  • CNIC copy of the applicant (owner or occupier).
  • Proof of ownership or occupancy: registry, fard, allotment letter, or a rent agreement with the owner's consent.
  • Reference number of the nearest neighbour's electricity bill (helps locate the feeder).
  • Wiring test report signed by a licensed electrical contractor.
  • Recent photographs and an undertaking, if asked by the form.

Exact requirements can differ by category; the portal lists them before you submit.

Advertisement

FESCO new connection fee and demand notice

There is no single fixed fee. The amount on the FESCO demand notice depends on the category, the load (kW), the meter type (single-phase, three-phase or TOU), security deposit and any cost of extending the line or installing a transformer. Homes near an existing pole with spare transformer capacity pay the least.

Pay only the amount on the official demand notice, at a bank. Anyone asking for "speed money" in cash is not an official channel; report it to the company.

Tracking your application

Enter your tracking ID on the ENC portal to see the stage: received, survey, demand notice issued, paid, meter installation. If the application is stuck at one stage for a long time, visit the sub-division with the tracking ID and ask what is pending (often a missing document or a survey visit).

NEPRA rules give companies time limits for each stage. If the company misses them without reason, you can complain to NEPRA.

Advertisement

Notes for FESCO applicants

FESCO handles many commercial and industrial applications in Faisalabad. Industrial connections need a load study, transformer and sometimes a dedicated line, so they take longer and cost more than homes. Your first FESCO bill usually arrives after the first full billing cycle once the meter is installed.

Pick the right load and plan solar early

Add up the appliances you will run at the same time. A normal 5-marla home with one AC usually works on 3–4 kW; homes with several ACs need more. Since the fixed charge depends on your sanctioned load, too high a load costs money every month.

If you plan solar, tell the electrician at wiring time and ask about net metering rules. A solar system with lithium battery installed from day one keeps your first bills low.

How to get a FESCO new connection

  1. Apply on the ENC portal or company website.
  2. Upload documents and save the tracking ID.
  3. Allow the site survey.
  4. Pay the demand notice at a bank.
  5. Get the meter installed and receive your reference number.

Official sources

Questions people ask

When will I receive my first FESCO bill?
Usually after the first full billing cycle once the meter is installed and the reference number is created.
Can a tenant apply for a connection?
Usually yes, with a rent agreement and the owner's consent or NOC. Check the requirements on the portal.
How do I apply for a FESCO new connection online?
Use the ENC portal (enc.com.pk) or the new connection link on the FESCO website. Choose your category and load, upload documents and save the tracking ID.
What is the FESCO new connection fee?
It depends on category, load, meter type and any line or transformer work. The exact amount is on the demand notice issued after the survey.
How do I track my FESCO new connection?
Enter your tracking ID on the ENC portal to see the current stage, or ask your sub-division office with the tracking ID.
What documents are needed for a FESCO new meter?
CNIC, proof of ownership or occupancy, the nearest neighbour's bill reference, a licensed contractor's wiring test report and the filled form.
What is a demand notice?
It is the official bill for your new connection costs (security, meter, line work). You pay it at a bank before the meter is installed.
How long does a FESCO new connection take?
Simple domestic connections can be done in a few weeks after payment. Cases needing new poles or a transformer take longer.